chore(deps): lock file maintenance #58

Merged
davide merged 2 commits from renovate-lock-file-maintenance into main 2026-09-22 15:51:14 +00:00
Member

This PR contains the following updates:

Update Change
lockFileMaintenance All locks refreshed

🔧 This Pull Request updates lock files to use the latest dependency versions.


Configuration

📅 Schedule: (UTC)

  • Branch creation
    • Between 12:00 AM and 03:59 AM, only on Monday (* 0-3 * * 1)
  • Automerge
    • At any time (no schedule defined)

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

♻ Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

👻 Immortal: This PR will be recreated if closed unmerged. Get config help if that's undesired.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Mend Renovate CLI.

This PR contains the following updates: | Update | Change | |---|---| | lockFileMaintenance | All locks refreshed | 🔧 This Pull Request updates lock files to use the latest dependency versions. --- ### Configuration 📅 **Schedule**: (UTC) - Branch creation - Between 12:00 AM and 03:59 AM, only on Monday (`* 0-3 * * 1`) - Automerge - At any time (no schedule defined) 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 👻 **Immortal**: This PR will be recreated if closed unmerged. Get [config help](https://github.com/renovatebot/renovate/discussions) if that's undesired. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Mend Renovate CLI](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0NC4xMDMuNiIsInVwZGF0ZWRJblZlciI6IjQ0LjEwMy42IiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6W119-->
chore(deps): lock file maintenance
Some checks failed
check-commitizen.yaml / Check the PR title (pull_request) Successful in 1s
check-formatter.yaml / Check with formatters (pull_request) Successful in 1s
check-prettier.yaml / Check files formatting (pull_request) Successful in 3s
check-yamllint.yaml / Lint yaml files (pull_request) Successful in 1s
check.yaml / Checks (pull_request) Failing after 10s
forgejo-agent / LLM Bot response generation (pull_request) Failing after 10s
e2a4fb3ea6
Merge branch 'main' into renovate-lock-file-maintenance
All checks were successful
check-formatter.yaml / Check with formatters (pull_request) Successful in 2s
check-prettier.yaml / Check files formatting (pull_request) Successful in 6s
check-yamllint.yaml / Lint yaml files (pull_request) Successful in 8s
check.yaml / Checks (pull_request) Successful in 1m48s
500ec71d52
Author
Member

Edited/Blocked Notification

Renovate will not automatically rebase this PR, because it does not recognize the last commit author and assumes somebody else may have edited the PR.

You can manually request rebase by checking the rebase/retry box above.

⚠️ Warning: custom changes will be lost.

### Edited/Blocked Notification Renovate will not automatically rebase this PR, because it does not recognize the last commit author and assumes somebody else may have edited the PR. You can manually request rebase by checking the rebase/retry box above. ⚠️ **Warning**: custom changes will be lost.
davide merged commit 49f2110ea1 into main 2026-09-22 15:51:14 +00:00
davide deleted branch renovate-lock-file-maintenance 2026-09-22 15:51:14 +00:00
Sign in to join this conversation.
No reviewers
No milestone
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
projects/kube-dns-rs!58
No description provided.